South-Extension-of-Chenzhou-Avenue

South Extension of Chenzhou Avenue

Form of cooperation: sale, lease, installation, technical service, maintenance

Type: 36M+27M single-layer mixed reinforced through steel bridge, 36M*54M cast-in-place support construction platform.

Features:
The 36M main span of the steel bridge uses a three-row reinforced structure, and the 27M span uses a double-row reinforced structure to meet the traffic requirements of 50T construction vehicles under load. Installed by the push method, the installation period is 13 days, and it was opened to traffic on May 8, 2011.

Bailey-Steel-Bridge

Leave a Comment