Huaneng-Hunan-Xiangqi-Hydropower-Station

Huaneng Hunan Xiangqi Hydropower Statio

Location: Upper Xiangjiang River at the junction of Qiyang and Qidong, Hunan

Form of cooperation: lease, installation, technical service, maintenance

Steel bridge model: 39M+39M+39M three-row double-layer structure through-type steel bridge.

Features:
Meet the traffic requirements of 50T construction vehicles. The installation conditions of this steel bridge are complicated, and the construction period is particularly tight. Our company has carefully arranged and reasonably organized and completed the installation tasks on time. It adopts the combination of push-out hoisting method and push-out method, and the installation period is 23 days.